A Grade II listed cinema, back to its original sandstone
Around 20 years of paint and grime lifted from a Grade II listed former cinema in Sunderland, taking the front back to its original sandstone with DOFF superheated steam. No sandblasting and no damage to the stone.
- Client
- Brims Construction
- Sector
- Building contractor
- Location
- High Street West, Sunderland
- DOFF steam cleaning
- Heritage paint removal
- Carved stonework
- Moss & algae removal
- Test patches
- High-level access
Brims Construction
Brims Construction are the main contractor on the Register Buildings at 114–118 High Street West, Sunderland: a Grade II listed former cinema with a Gothic gable, spires and carved sandstone detail.
The front had been painted over for around 20 years, and the stonework higher up was covered in grime, moss and algae.
Take the facade back to its original sandstone without harming it. Because the building is listed, sandblasting and aggressive pressure washing were ruled out: they would take the face off the stone and blast the mortar out of the joints. The work also had to happen safely on a busy town-centre street.
The transformation
Drag the slider to compare.
Before
After
How we delivered it
We used DOFF: water heated to as much as 150°C at low pressure, so the heat does the work rather than force. A conservation paint remover softened the old coatings, then the DOFF lifted the paint away and left the stone and mortar intact.
Every surface started with a test patch so the settings suited the stone. Our cherry picker reached the gable, spires and finials, and a scissor lift let us work methodically along the front, bay by bay.
Filmed on site, High Street West, Sunderland
-
01
DOFF steam cleaning
Superheated water at up to 150°C and low pressure lifts paint and grime while protecting the stone face and mortar joints.
-
02
Heritage paint removal
Around 20 years of paint stripped from the facade with a conservation paint remover and DOFF.
-
03
Carved stonework
Gable, spires, finials, corbels and window surrounds cleaned with no sandblasting or abrasives.
-
04
Moss & algae removal
Biological growth removed from copings, sills and carved stone. The heat kills the spores, so it is slower to come back.
-
05
Test patches
Each surface trialled first so temperature and pressure were right for the stone.
-
06
High-level access
Our own 22m cherry picker for the gable and spires, plus a scissor lift along the front.
Every stage, start to finish
32 photos · tap any photo to enlarge
Finished to the standard Brims Construction expects
The sandstone is back on show for the first time in around 20 years, with the carved detail, mouldings and mortar joints intact. The front of the old cinema now looks the way it was built to look.
How we work with main contractors & facilities teams
The same planned, documented approach on every commercial job, big or small.
Site survey & RAMS
We walk the site, agree access and programme, and issue risk assessments and method statements before we mobilise.
Test patch & method
Products, pressures and temperatures are proven on a small area first, so there are no surprises on the main elevation.
Self-sufficient delivery
Our own 22m cherry picker, water supply and specialist kit, working around your trades, tenants and day-to-day operations.
Sign-off & handover
We walk the finished job with you, put right anything outstanding and leave the site clean and safe.
- Self-sufficient
- RAMS & compliant
- Fully insured
- 24/7 mobilisation
More recent work
All projects →Planning something similar?
Free site surveys and quotes for contractors, facilities managers and building owners, 24/7 across Teesside and the North East.