24/7 SERVICE
SM Thompson Ltd: A steel stockist’s warehouse, transformed
Clean & re-spray

A steel stockist’s warehouse, transformed

A full commercial clean of the whole outside of SM Thompson’s warehouse, then a complete re-spray. Years of rust, grime and staining washed off, steelwork re-coated black and the cladding re-sprayed blue, all from our own cherry picker.

Client
SM Thompson Ltd
Sector
Steel stockists & profilers
Location
Middlesbrough
Services delivered
  • Full exterior clean
  • Steelwork re-coating
  • Cladding re-spray
  • Cherry picker access
  • Live-site working
22m
Cherry picker reach
3
Stages: clean, steelwork, re-spray
0
Scaffolding needed
THE CLIENT

SM Thompson Ltd

SM Thompson Ltd are steel stockists and profilers in Middlesbrough, supplying plate and profiled steel from a large warehouse and working yard.

The outside of their main building had taken years of hard industrial use: rust-streaked cladding, tired steelwork and heavy black staining above the loading bays.

THE BRIEF

SM Thompson wanted the whole building to look as professional as the business inside it, without scaffolding a long, high warehouse or closing the yard. Forklifts, plate stock and deliveries would be moving around us throughout.

Before: years of rust and black staining along the long elevation
Before: black staining above the loading bay Before: weathered, stained cladding
BEFORE & AFTER

The transformation

Drag the slider to compare.

SM Thompson Ltd after SM Thompson Ltd before Before After
WHAT WE DID

How we delivered it

First, a full commercial clean: we pressure-washed the entire outside of the building, cladding and steelwork, from our truck-mounted cherry picker to strip back the rust staining, grime and years of build-up.

With every surface clean, we re-sprayed the lot. The beams, columns and cross-bracing were re-coated black, and the cladding was re-sprayed in SM Thompson blue, section by section, moving the cherry picker along the building and working around the yard’s day-to-day operations.

Filmed on site, Middlesbrough

  1. 01

    Full exterior clean

    Rust staining, industrial grime and black staining pressure-washed from every elevation.

  2. 02

    Steelwork re-coating

    Eaves beams, columns and cross-bracing brought back to a crisp black finish.

  3. 03

    Cladding re-spray

    The whole building re-sprayed in the client’s blue for a sharp, consistent finish.

  4. 04

    Cherry picker access

    Our own truck-mounted cherry picker reached the full height of the building, with no scaffolding.

  5. 05

    Live-site working

    Work planned around forklifts, plate stock and deliveries so the yard kept operating.

THE RESULT

Finished to the standard SM Thompson Ltd expects

A stained, tired warehouse is now a bold blue building that matches the SM Thompson brand. It is the first thing customers and drivers see when they pull into the yard, and it now looks the part.

SM Thompson Ltd on completion
WORKING WITH US

How we work with main contractors & facilities teams

The same planned, documented approach on every commercial job, big or small.

1

Site survey & RAMS

We walk the site, agree access and programme, and issue risk assessments and method statements before we mobilise.

2

Test patch & method

Products, pressures and temperatures are proven on a small area first, so there are no surprises on the main elevation.

3

Self-sufficient delivery

Our own 22m cherry picker, water supply and specialist kit, working around your trades, tenants and day-to-day operations.

4

Sign-off & handover

We walk the finished job with you, put right anything outstanding and leave the site clean and safe.

  • Self-sufficient
  • RAMS & compliant
  • Fully insured
  • 24/7 mobilisation

Planning something similar?

Free site surveys and quotes for contractors, facilities managers and building owners, 24/7 across Teesside and the North East.